Back to module

Guided diagnostic

Workforce as Productive Capacity: People Under a Hamiltonian Filter

One question at a time. Yes / Partially / No + short note. Same checklist as the module page.

One-Page Diagnostic Checklist

0 of 16 complete. Yes / Partially / No + short note. Progress stays on this device.

1. Diagnostic Checklist

  1. We have named 1–2 critical seat families (roles where loss of two long-tenure people would break delivery or knowledge).

  2. Leadership has named at least one critical seat family that will not be designed as a permanent short-cycle temporary or visa labor seat (Module 5 required output).

  3. We can point to where short-cycle temporary or visa labor is a bridge vs a permanent design assumption.

  4. Failure mode check: Any critical seat still designed as permanent short-cycle temporary or visa labor coverage is treated as a capacity risk, not a neutral staffing choice.

  5. We know which critical seats would fail if two long-tenure people left in the next 90 days.

  6. We run standard GWC (Gets it, Wants it, Capacity to do it) on open and critical seats.

  7. We also ask the American System question after GWC: Does this seat design reduce dependence on short-cycle temporary or visa labor and build institutional knowledge that stays?

  8. Open seats still assume (or no longer assume) “we can always contract or visa our way through.”

Scorecard & visibility

  1. The Scorecard includes these locked capacity metrics (verbatim) for a named seat family:

  2. Operators who own the seat family own those metrics (not only Finance/HR).

  3. A green cost/fill Scorecard can still be treated as a problem if capacity metrics are red or missing.

Process & Level 10

  1. Level 10 IDS (Identify, Discuss, Solve) is used when capacity is slipping and cost still looks fine — not only when headcount is short.

  2. Accountability Chart makes critical knowledge and decision rights visible (not only interchangeable boxes).

Anchors (shared language)

  1. Team can state the Elevator logic: when elevators stopped needing a dedicated operator, work moved into higher-skill design, maintenance, and system roles — design should elevate work into higher-skill American roles, not only eliminate hours.

  2. Team can state the Freedom Haulers / sovereign pipeline idea: replacing short-cycle temporary or visa labor CDL capacity with American veterans who already hold the skill is a workforce and pipeline decision, not only a cost line.

  3. Posture: Operating in the United States is not workforce-neutral. Seat design either builds lasting productive capacity or rents weakness.

Anytime Fit